commercial pool retirement village

commercial pool retirement village

This concrete and plaster pool had previously been recoated. We applied the Aquaguard 20-20 system to the interior surface of the swimming pool. 

Resurface process of existing concrete pool with fibreglass lining Aquaguard 2020:

Preparation:

  • Drain swimming pool.
  • Surface preparation, abrasive sanding of the existing surface, cleaning and chemical etching.
  • Install attachment system.

Application of fibreglass reinforced laminate:

    • Application of the primer coat. VE resin.
    • Application of the reinforcement material CSM.
    • Application of the bulk resin coat. VE resin.

Application of finishing coats:

  • Sanding and bogging the laminate.
  • Completion of attachment system.
  • Application of the under coat.
  • Remedial sanding.
  • Application of the final coat.
    •  
Scroll to Top